Sign In | Join Free | My jazzonln.com
jazzonln.com
Wuxi Zhongborui Machinery Co. Ltd.
Wuxi Zhongborui Machinery Co. Ltd.
Home > Silo Forming Machine >

PLC Actomatical Control Steel Silo Roll Forming Machine

Wuxi Zhongborui Machinery Co. Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Wuxi Zhongborui Machinery Co. Ltd.
City: Wuxi
Province/State: Jiangsu
Country/Region: China
Tel: 86-510-66812720
Contact Person:
Mrs Qin

PLC Actomatical Control Steel Silo Roll Forming Machine

Brand Name : ZBR
Model Number : ZBR-S-1082
Certification : CE ISO
Place of Origin : Jiangsu
MOQ : 1 SET
Price : Negotiated
Payment Terms : Negotiated
Supply Ability : 10 sets per month
Delivery Time : 30 days
Packaging Details : export package
After-Sale Service : Lifetime
Material Width : Up to 1500mm
Total Power : About 22KW
Shaft Diameter : Up to 120mm
Operation Worker : one
Production Type : Automatically
Contact Now

PLC Actomatical Control Steel Silo Roll Forming Machine


A. The technique data

1 Materials : 1.5-4mm galvanized G450 coating coils, 275 to 450 mpa yield.
Feeding width: 1290 for 4mm 1293 for 2.5mm 1297 for 0.8 mm
2 Forming steps: about 18 stations
3 Material of rollers: Gcr15 steel precision-machined, high frequency quenching HRC58-62
4 Material of main shaft : 45# high quality steel (diameter>¢50)
5 Cutting: hydraulic cutting; quenching HRC58-62
6 Electronic control: PLC control Panasonic Brand
7 Dimension of machine: 11500mmX1350mmX800mm
8. Working speed:5-8m/min
9 Drive system: gear box drive
10 Main motor power: 90kw
11. Punching moulds: 3 sets of punching dies at one time
12. Curving machine: Curving continuously to make the sheets straight, the min Radius 1.8m,
the Radius can be adjustable.
13. Cutting: Hydraulic cutting
14. Hydraulic station power 55kw, the pressure 25-30Mpa.
15. Out table: lift auto stacker


B. Machine list

NumberMachine listNumber
15 tons manual decoiler1 set
2Feeding&leveling device1 set
3Gear box drive system1 set
4Main forming machine1 set
5Curving device1 set
6Hydraulic Cutting device1 set
7Auto stacker 6 meters1 set
8PLC control system1 set
9Hydraulic station1 set



C. Working Flow of Roll Forming Machine

De-coiler-feedingwithguide→Straighteningdevice→mainrollformingmachine→Curving device→run out table

1.Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)

2.Servo Feeding Applicator............................................To feed the material accurately

3.Hydraulic/Press Punching...........................................To punch as requirements

4.Roll Forming Unit.........................................................To roll form as requirements

5.Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)

6.Output Table................................................................Support the finished products


D. Advantage of machine

1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 10 Years Experience
5. Durable
6. Reliable


E. Warranty, Year warranty.

During the warranty period, maintain and change the spare parts for the customers for free (except for the instrument damage caused by human factors or natural disasters. ) And provide technical support for life-long.
We can design and manufacture the machine according to clients' request! Our machines have passed CE, Guaranteed quality. Please send us the enquiry with Profile Drawing.


F. After-sale Serive

- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)



China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

PLC Actomatical Control Steel Silo Roll Forming Machine Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Wuxi Zhongborui Machinery Co. Ltd.
Subject:
Message:
Characters Remaining: (0/3000)